This 2012 lagoon expansion project 2 for the Town of Gull Lake to brings their sewage handling and storage capacity in line with provincial regulations and provides for a modest growth rate over a 20-year time horizon. The expansion cell is designed to release the treated effluent to Bridge Creek approximately every 180 days.

Project Details:
  • lagoon expansion cell capacity of 49,600 m³
  • manhole-style sewage transfer station
  • 1.6 km HDPE 150 mm diameter forcemain
  • design consideration for future expansion cells
Project Area: 2.5 ha
Project Cost: $1.3 M