Town of Pense Water Reservoir

Pense 5

Pense 4

Pense 3

Pense 2

Pense 1

To meet the water requirements for distribtion and fire protection for the gorwing community, this project was undertaken and completed in 2006. Walker Projects completed the preliminary and detailed design drawings, approvals, tendering, construction inspection, and documents.

Project Cost: $.460 M
Project Scope: •560 m³ reinforced concrete treated water storage reservoir expansion constructed adjacent to the exsisting 55.4 m³ reservoir; •Remove two exsisting distribution pumphouse and provide two VLS larger exsisting 19.2m²; •Provided new engine driven VLS standby pump rated at 56.8 Litres Per Second (LPS); •Associated pipework, valves, meter, new, meter, new electrical controls, and truck fill.