Village of Montmartre Water Treatment Plant

Montmartre 9

Montmartre 8

Montmartre 1

Montmartre 7

Montmartre 4

Montmartre 2

This project was undertaken in 2010/11 to upgrade the aging water treatment plant in support of continued growth of the community. Walker Projects completed the preliminary and detailed design, approvals, tendering, and construction inspection and documents.

Project Details: Upgrade floccalculator and clarifier with new troughs and baffle wall Upgrade 3.35m² gravity filter with new under drain and air wash/scour systems Replace two Vertical Line Shaft (VLS) distribution pumps with Variable Frequency Drive (VFD) - each rated at 12.6 Litres Per Second (LPS) Replace engine driver VLS standby pump rated at 47.3 LPS Replace pipework, valves, level controller, chemical feeders, electrical and controls
Project Cost: $.375 M